End-of-Operation Record

Wiki Article

All operations related to the decommissioning of Site-96 have been finalized. The subsequent report outlines the results of the operation.

Staff were extracted from the site concurrent with the triggering of the termination protocols.

A thorough evaluation of the site revealed negligible collateral impact.

Ongoing analysis is necessary to assess the long-term consequences of the termination event.

A detailed documentation will be transmitted to higher command upon completion of these investigations.

Log Entry: Site-96 - Containment Breach Protocol Omega

A full categorical breach has occurred at Site-96. The initial anomaly is a spatial distortion that appears to have compromised the material integrity of the containment perimeter. All personnel are advised to instantly withdraw the site. Containment Protocol Omega is now in effect. Further details are pending assessment. Please await for further instructions.

Incident Log: Omega-10 - Personnel Disappearance

On [Date] at approximately 14:32, a report of personnel disappearance was logged. The missing individual, designated as Subject Delta, was last seen from the secure zone during routine operations. All initial security protocols were activated upon detection of the absence. A extensive search was initiated within the designated perimeter, utilizing specialized units. The motive behind the disappearance remains unknown, and investigations are in progress to ascertain the full circumstances.

Site-96 Security Protocols Revised

Effective immediately, all personnel assigned to Facility-96 are required to comply with the newly implemented security protocols. These revisions, prompted by recent occurrences, aim to strengthen the overall security posture of the facility and mitigate the risk of breaches. A comprehensive list of these revised protocols is appended hereto in a document available through the secure portal. All personnel shall familiarize themselves with the updated protocols and display their understanding during the mandatory training session scheduled for shortly. Failure to adhere to these revised protocols will result in reprimand up to and including revocation of clearance.

Observance with these revised protocols is essential to maintaining the integrity and stability of Sector-96.

Anomaly Report for Site 96

This report details the containment procedures currently in effect at Site 96. The site is designated as a Level 4 anomaly containment zone due to the manifestation of an unidentified anomalous entity (UAE). Initial reports suggest the UAE possesses cognitive dissonance inducing properties.

Observations indicate a fluctuation in the anomaly's activity levels, with periods of unpredictable energy spikes}. This Site Ninety Six erratic behavior necessitates continuous monitoring and modification of site protocols. Further investigation is required to fully understand the nature and motivations of the UAE.

Subject Recovery Attempt - Site-96

Initiating Protocol ALPHA-12. Primary containment breach confirmed at Sector Gamma. Subject believed to be in state of high agitation. Deploying specialist teams as immediate response team. Requesting full site lockdown activation.

Command awaiting further updates. This is a developing situation.

Report this wiki page